PhpStorm 2025.3 Help

Project analysis

Project analysis allows PhpStorm to enable smart IDE features: code completion, inspections, refactoring, navigation, finding usages, and syntax highlighting.

PhpStorm triggers this process after you open or clone a new project, enable or disable plugins, and switch between branches. It is also triggered after large external file updates (for example, if multiple files are created or generated when you build your project).

Analyzing project message in the status bar

During the analysis, PhpStorm examines the code in your project to create a virtual map of classes, methods, objects, and other code elements that make up your application. The result of this process is the project files index, which allows the IDE to provide instantaneous smart features such as coding assistance, search, navigation, and so on.

While the analysis is in progress, smart IDE features might be unavailable or partially available. However, this does not prevent you from using PhpStorm: you can still type code, work with VCS features, configure settings, and perform other code-unrelated actions.

Tracking the project analysis progress

While project analysis is running, you can track its progress in the status bar, which is located at the bottom of PhpStorm.

Waiting for scanning to complete in the lower-right corner of PhpStorm

If you click the status bar, the Processes dialog opens, where you can find processes that are currently in progress or in queue.

Processes dialog with project analysis tasks

The main processes of project analysis include:

  • Scanning files: checking which files should be analyzed. This process cannot be paused or canceled.

  • Analyzing project to enable smart features: examining and indexing the file contents. This process can be paused (and resumed), but not canceled.

You can check the state of each process below its progress bar. When all processes of project analysis are completed, PhpStorm clears the status bar. This indicates that smart IDE features (such as coding assistance and finding usages) are ready to use.

Reducing the project analysis time

The amount of time it takes to analyze your project depends on its size: the more complex your project is, the more files it contains, and the more time the IDE needs to analyze it. You can reduce the project analysis time by excluding files and folders.

Exclude files and folders from project analysis

You can mark dynamically generated files and folders as excluded to speed up project analysis and improve the overall IDE performance. Excluded files and folders are not indexed during project analysis (therefore, smart IDE features are not available for them), but they remain part of the project.

Exclude files from project analysis

  1. Go to the Project tool window (Alt+1).

  2. Right-click a file and select Override File Type | Plain text.

    Plain text files are marked with the Plain text icon represented by horizontal lines icon.

Exclude folders from project analysis

  1. Go to the Project tool window (Alt+1).

  2. Right-click a folder and select Mark Directory as | Excluded.

    Excluded folders are marked with the Excluded root icon represented by an orange folder icon.

21 January 2026