TeamCity Cloud 2022.10 Help

TeamCity Sakura UI

The Sakura UI, first introduced in TeamCity 2019.1 as an alternative to the classic UI, is now the default TeamCity UI. While the classic UI is still available and is maintained, the new product features will be supported in the Sakura UI only.

We recommend that you use the Sakura UI and benefit from a fresh, modern interface created with accessibility in mind. This new UI is actively developed, and your feedback is welcome.

Enabling and disabling Sakura UI

When you sign in to TeamCity for the first time, the Sakura UI is enabled by default.

If you were using the classic UI, after upgrading TeamCity will offer you to switch to the Sakura UI and will remember your choice.

You can change the default UI in Your Profile | UI settings via the Use Sakura UI checkbox.

All pages supporting the new UI have a toggle to quickly access the classic UI: Switch to the classic UI. To return to the Sakura UI, click the magic wand icon: Switch to the Sakura UI.

The section below provides an overview of the differences between the Sakura UI and the classic TeamCity UI.

Features of Sakura UI

The new UI comes with a handy sidebar that serves for quick navigation.

Currently, the Sakura UI is available for the following pages:

Below, you’ll find a recap of these features.

Sakura sidebar

This improved sidebar displays the project hierarchy and, for the Agents page, shows agent hierarchy and serves for better navigation between projects, build configurations, or build agents.

You can change the sidebar width by dragging its frame border and hide/show it anytime by clicking the corresponding button at its bottom.

To customize a sidebar, click wn-pencil.png in its upper-right corner. In the customization menu, you can move a project or build configuration in the list via a keyboard or using the arrow UI button, or mark/clear projects as your favorite.

Projects sidebar

The Projects sidebar lists all the projects available to the current TeamCity user and allows searching them by name. You can expand any project to see its nested subprojects / build configurations and quickly switch between them. The status icons and counters for all its nested objects are also displayed in the sidebar.

Sakura projects sidefar

The sidebar allows accessing the Favorite projects and Favorite builds views with the lists of your favorite projects and favorite build configurations respectively.
You can also toggle the display of archived projects.

You can use the Q keyboard shortcut to focus on the projects' search field. When focused, use and keyboard arrows to navigate between search results. To remove the focus, press Esc.

Sakura Project Home page

The Overview tab of the Project Home page provides more visibility of the project's subprojects and build configurations. The page has two main views: Builds and Trends.

The Trends view comprises cards that represent build configurations of the selected project.

Sakura Project Trends page

Each card contains a preview of the most recent builds displayed as bars on a timescale. You can hover over any bar to instantly see more information about the build: its duration, queue statistics, test results, used agent, and more. The card also displays the number of pending changes.

project-trends.gif

The Builds view is similar to the classic UI and displays the list of the recent builds in subprojects and build configurations of the current project.

project-builds.png

Sakura Build Configuration Home page

The Overview tab of the Sakura Build Configuration Home page provides two views:

  • Branches, listing the recent builds in active branches

    bc-branches.png

  • Builds, listing all the recent builds of the configuration

    bc-builds-history.png

Every build item in the list is expandable: click it to preview the most important information about the build and get quick access to any of the Build Results tabs.

Click a specific build problem or failed test to see the related stack trace:

build-test-stacktrace.png

Click Open in build log to open the new build log exactly at the line where the problem occurred.

The Changes pop-up block displays build changes sorted chronologically and grouped by their origin: user commits to the code and changes in artifact dependencies. You can also filter the changes by their author and display changes made in the build configuration settings.

Example of the Changes pop-up block:

Sakura Changes pop-up

Sakura Build Results page

This page visualizes build results and provides several handy widgets.

The Actions menu offers several handy options:

build-actions.png

Overview tab

In the upper right corner, you can see the trends for the previous builds of the current build configuration. Hovering over a bar brings up a pop-up with the build details.

Build trends preview

The interactive graphic timeline reflects the duration of each build stage and indicates build problems if any:

Build timeline

Click any stage to open the corresponding line of the build log. The long logs can also be displayed directly in the preview, without downloading.

Changes tab

The Changes tab displays more information about the changes in the build, separately for user commits and artifact changes. You can filter changes by their author and display changes made in the build configuration settings.

build-changes.png

Tests tab

The Tests tab allows switching between failed, ignored, and succeeded tests. Click a test to quickly view its details or, for example, to assign an investigation. You can also view its history on the new Test History page.

The Test History page has better performance now. It also has an adjustable range slider allowing you to select a period of the test history that will be displayed below. The tests timeline is interactive:

build-test-history.gif

The list of builds that ran this test has improved usability now: on clicking a build, the stacktrace is displayed.

Dependencies tab

The Dependencies tab boasts of a new more user-friendly design.

It provides three alternative modes of displaying the build dependencies: a visual timeline, structured list, and build chain. Choose the mode that is the most helpful for your current task.

The interactive timeline shows the sequence of builds and the duration of each build in this pipeline. It has an adjustable range slider allowing you to select a build of the pipeline.

dependencies-timeline.png

The list is a flat line of the builds, which also has a lot of interactive features: you can click and expand a build line and review the results.

dependencies-list.png

The chain page loads faster and demonstrates build dependencies more clearly.

dependencies-chains.png

Sakura Agents page

The Sakura Agents page loads faster for a large number of agents and allows switching between agent details quickly.

The page provides a better hierarchical view of agent pools and makes it easier to see all their assigned projects and cloud images.

The All Agents view gives a quick preview of all agents' statuses and allows managing them side by side, on a single dashboard.

You can edit the scope of agent pools and quickly assign agents and projects to them.

To edit an agent pool, click Assign agents in its settings. In this dialog, you can choose what agents you want to assign to the pool:

Edit agent pool in new TeamCity UI

Note that whenever you select a cloud image, you actually assign all its instances to the pool. If this pool has a limit of agent slots, each cloud instance will take a single slot, just like any regular agent.

Similarly, you can also associate projects with this pool: open the Projects tab of the pool's settings and click Assign projects. This way, agents assigned to this pool will be allowed to run builds only in the selected projects.

Agents sidebar

The Agents sidebar allows browsing the agent pool hierarchy including cloud profiles and searching agents and pools by name. The Overview view provides statistics about all the agents on the server.

agents-sidebar-overview.png

Sakura Changes page

The Sakura Changes page comes with filters providing flexible search options allowing you to sort changes by comment (commit message), by path to the changed file, and by revision number.

changes-page.png

Sakura Queue page

On this page, you can see the position of a build in the queue and view the queued build's details:

Sakura build queue

Plugin API

The Sakura UI extends the TeamCity plugin API and provides a set of handy tools to create plugins.

plugin-api-qodana.png

Last modified: 21 November 2022